Recent content by PMGoneRogue

  1. P

    stitch drilling clean up

    Thanks for the quick replies. Woody, No, it's an internal leaf, the right hand side used to be external but the wall continues on for another 300mm before it see's the outside world now. The photo is taken from inside the original room and into the extension.
  2. P

    stitch drilling clean up

    Hi guys, First time posting here so go easy on me. Short version I have a stitch drilled knockthrough that looks pretty rough, the bricks didn't really hold up that well, and I need to smooth down whats left to either plaster over or potentially add something else for structural support. I...