Recent content by danfre

  1. D

    What have you been doing today?

    Congratulations to all the family
  2. D

    Vents in kitchen cupboard door for boiler

    You may need compartment ventilation, check the manufacturers instructions
  3. D

    Will a non-reverse valve cause a pipe to burst when blocked and what's the likelihood

    Pretty sure your waste pipes are 40mm, this is undersized. A vent pipe is a pipe on the system that is taken high up and left open. If no vent is installed it can create a vacuum on the system and you have trouble with the water not discharging properly. Maybe worth taking to the freeholder if...
  4. D

    Worried about this

    18 KW boiler requires approx 1.8 cubic metres of gas . 15mm copper pipe at 3 metres length, capable of discharge of approx 2.9 cubic metres
  5. D

    Worried about this

    I would have run it in 22mm . However it will not be a problem regarding pressure drops etc
  6. D

    Will a non-reverse valve cause a pipe to burst when blocked and what's the likelihood

    Pipe work looks undersized. Would also help if it was vented high up
  7. D

    Damp problem possibly caused by leaking drain. Any advice?

    It could be possible to do a air pressure test, or maybe a bung at manhole and water test depending on pipework
  8. D

    Twin Flu

    No, very costly to run unless you have a super insulated property.
  9. D

    Twin Flu

    Try Ideal, they bought out keston boilers who did twin flues.
  10. D

    Issue with builders progress

    Seem to remember that any money paid was deemed to include Vat. Check with local Vat office to find out if they are registered. It sounds like a con
  11. D

    What’s wrong with this DRIVEWAY

    Looks like they have laid pavers on top of mot
  12. D

    What have you been doing today?

    Conny, so very sorry to hear your news. I always liked reading your posts, you are definitely one of the good guys . Wishing you and your family the very best
  13. D

    At risk notice: "Gas pipe not using correct entry/exit point of meter box"

    Your gas pipe should exit from the bottom of the meter box
  14. D

    Hot water temp is 40 Degrees - Ideal Mexico 2 Boiler

    Raise the cylinder and use 28mm pipe work
  15. D

    Leaking Pipework

    Temperature drop, valve has opened. Use the shut down cap supplied with the thermostatic valve or a 15mm blanking end
Back
Top